Plan local and company deployment
Confirm storage, networking, model providers and recovery before rollout.
Map the deployment
Distinguish the desktop client, business service, database and model provider. Validate service versions, network scope, authorization and persistent storage independently. A local demonstration is not a production deployment.
Plan backup and recovery
Create a backup plan for organization and knowledge data with an owner and documented recovery steps. Rehearse recovery in isolation. For legacy local file storage, stop the service before consistent backup or restore.
Review model data flows
Local knowledge storage does not imply offline inference. External model calls may send task content to the configured provider. Confirm providers, data scope and company requirements during deployment.
Expand the pilot gradually
Begin with one project, non-sensitive data and a named reviewer. Expand only after connection tests, access checks, result review and recovery rehearsal.
Environment handover checklist
The deployment record should let another engineer reproduce the environment. Validate private networking, offline models, identity integration and migration requirements before including them in scope and estimates.
- Versions: client, services, database, executors and compatibility.
- Network and identity: endpoints, egress, account owners and credential rotation.
- Data and recovery: paths, backup schedule, recovery targets and drill results.
- Operations: log locations, capacity, alert owners, upgrade and rollback steps.
Choose self-service or FDE delivery
Self-service suits teams with technical ownership, a clear workflow and limited integrations. A Forward Deployed Engineer works with business and technical owners on workflow discovery, adaptation, acceptance and handover. On-site work, dedicated environments, migration and ongoing support are scoped separately; models, infrastructure and third-party licenses are budgeted separately.